Section 01

Three questions per step

For each step in a workflow we ask: what is the cost of a wrong output, how reversible is it, and how confident can the system be that it is right? A wrong tag on a document is cheap and reversible. A wrong payment is neither. The answers decide whether the step runs automatically, runs with review, or stays entirely with a person.

Section 02

Controls that travel with the build

Approval points, role-based access, audit logs, confidence thresholds, exception queues and a documented fallback to the manual process are scoped before production access is granted, not retrofitted after an incident. They are part of the system's definition of done.

The controls are also how autonomy is earned. A step that has been reviewed a thousand times with a known error rate can be considered for automatic handling. A step that has never been measured cannot.

Section 03

What this looks like for the people involved

The finance officer still approves every bill, but now reviews prepared, validated records instead of keying them. The customer service lead still sends every reply, but starts from a referenced draft. Their judgement is used where it matters and their time is not spent where it does not.

Key takeaways

If you remember three things.

  1. 01Decide step by step based on cost of error, reversibility and achievable confidence.
  2. 02Scope approvals, access, logging and fallback before production, as part of done.
  3. 03Extend autonomy only where the measured error rate supports it.